Help Center › Patrols and checkpoints › Create a tour with time specifications (minimum and maximum duration)
Create a tour with time specifications (minimum and maximum duration)
Set how long a tour may take at minimum or maximum. With speed recommendations in the app and evaluation in the tour completion.
Updated 25 Nov 2026 · Portal 9.34 · Tours and checkpoints · 3 min
In this article
- What minimum and maximum duration are good for
- Enter the time specifications on the Specifications tab
- What the employee sees in the app
- Find deviations in the tour completion
Some customers require a tour to take a certain amount of time. Anyone who rushes can easily miss an open window. Anyone who is too slow makes the contract uneconomical. With the Specifications you set a Minimum duration and a Maximum duration for each tour. The app helps the employee stay within the timeframe.
Prerequisites
- The tour has been created and has route points, see Create a tour.
- You are allowed to manage tours.
Step 1: Open the Specifications tab
Open Master data, Tours and click the tour. Switch to the Specifications tab. It contains the two boxes Minimum duration and Maximum duration.
Step 2: Enter the minimum duration
Click Enter minimum duration. Enter the time under Minimum duration (in minutes), for example 25. Below are two tick boxes:
- Provide speed recommendations to the employee in the app and point out the shortfall of the minimum duration: the app alerts the employee if they are too fast.
- The tour cannot be completed before the minimum duration is reached: the employee can only finish the tour once the minimum duration has been reached.
Click Save.
Step 3: Enter the maximum duration
Click Enter maximum duration and enter the time under Maximum duration (in minutes). With the tick box Provide speed recommendations to the employee in the app and point out exceeding the maximum duration, the app alerts the employee if they are too slow. Click Save.
You do not have to set both values. The maximum duration must not be less than the minimum duration, and the two must not be the same. Otherwise the portal will point this out.
Step 4: What the employee sees
In the app, the employee sees the specifications during the tour. If you have enabled speed recommendations, the app recommends walking more slowly when scanning too fast, and walking faster when scanning too slowly. A warning tone draws extra attention to it.
The recommendations are based on averages across the checkpoints. On short tours with few points they can therefore seem a little erratic.
Step 5: Evaluate deviations
Open Work Results and then Tour completion. The Duration column shows how long each tour took. Tours outside the specifications are marked with Duration below minimum or Duration over maximum. Use Filter and Duration to find them.
Good to know
- The specifications apply per tour. If you change them, the change applies to future tours.
- When the tour is due is set separately in Scheduling, see Set the order and schedule of a tour.
- If an employee has to interrupt the tour, they can pause it, see Pause a tour.
FAQ
I only want a minimum duration, no maximum.
Only enter the minimum duration. The maximum duration stays empty and is not checked.
The employee cannot finish the tour.
Probably The tour cannot be completed before the minimum duration is reached is active and the time has not been reached yet. Remove the tick if the employee may finish earlier.
How do I remove a time specification?
Open the Specifications tab, edit the value and save. You can see the change later on the tour's Amendments tab.