Help Center › Time tracking and rostering › Set the order and schedule of a tour

Set the order and schedule of a tour

Decide whether checkpoints must be scanned in a fixed order and when a tour is due. Using Mandatory, Flexible and schedule rules in the portal.

Portal

Updated 25 Nov 2026 · Portal 9.34 · Times and scheduling · 5 min

In this article

  • Flexible and mandatory order compared
  • What the advanced order behaviour changes
  • Create a schedule with a schedule rule
  • Add periods, exceptions and appointment lists

Two questions decide how strictly COREDINATE monitors a tour: in which order must the checkpoints be visited, and when is the tour due? You set both per tour in the portal. In practice, a fixed order is only worth it where there is an ideal route. Otherwise some variation is actually welcome, so that your patrol does not become predictable.

Prerequisites

Step 1: Set the order of the route points

Open Master data, Tours, the tour and the Route point tab. The Order column shows Flexible or Mandatory for each point. Use the pencil in the row to change the setting.

  • Flexible: it does not matter when the employee scans this point. The app shows which points are already done.
  • Mandatory: COREDINATE checks whether the points are scanned in the order of the list. If the employee scans the wrong point, the app shows which point was scanned and which one would have been next.

The order follows the Rank column. Drag a point by its handle to a new position or type the number directly. For a monitored order you need at least two mandatory points.

Step 2: Advanced order behaviour (optional)

If you mix flexible and mandatory points, the Advanced order behaviour switch on the General tab helps. When it is active:

  • The mandatory points must be processed exactly in their sequence.
  • The flexible points in between form blocks. Within a block, the order does not matter.

This means a single mandatory point is enough, for example a vault room that must always come in the middle of the round. Click Save after switching.

Step 3: Create a schedule

Switch to the Scheduling tab. Without a rule it says No scheduling, no limit in execution. The tour can then be started at any time.

Click Add schedule rule. The wizard has three steps:

  • Rhythm: Once, Daily, Weekly, Monthly or Yearly, each with a time. Example: weekly on Mondays and Thursdays at 22:00.
  • Timeframe: how often the tour has to be completed per appointment, and how much Lead time and Lag time the employee has.
  • Reminder: a notice in the app before the appointment.

Finally, click Save. Each step is described in detail in Set reminders for schedule rules.

Step 4: Check and restrict the rule

The rule appears as a card with rhythm, time, time window, amount and reminders. On the right, the scheduled completions list shows the next appointments. Use the pencil to edit the rule and the bin to delete it.

Use Add restriction to narrow the rule down further:

  • Add validity: the rule only applies during this period, for example during a trade fair.
  • Add exception: the tour is dropped during this period, for example during company holidays.
  • Add execution days from a schedule list and Add exceptional days from a schedule list: days from a maintained list, for example public holidays, see Create appointment lists.

Good to know

  • A tour can have several schedule rules, for example one for weekdays and one for the weekend.
  • If a due tour is not completed in time, it appears in Tour completion with the status Time expired.
  • If employees start a tour only in the last seconds of the lag time, it can appear twice in the portal: once as completed and once as Time expired. Better to plan in some buffer.
  • You set how long a tour should take at minimum or maximum on the Specifications tab, see Create a tour with time specifications.

FAQ

Which order should I choose?

Flexible is usually enough. Only choose Mandatory if the sequence matters, for example for a fixed route through a large building.

The tour cannot be started in the app.

Check on the Scheduling tab whether a time window is open right now. Outside the lead and lag time, a scheduled tour is not due.

Do I need a schedule at all?

No. Without a schedule rule, the tour can be carried out at any time. You need a schedule if you want to check whether the tour was done at certain times.